Dies for precision-sensitive fastener programs
Match screw size, drill diameter, flute length and style to the current product table and approved drawing. Validate the intended joint with the finished screw. Evaluate HSS/carbide and optional PVD against the actual wire and forming process.
Agree critical drawing dimensions, tolerances, measurement methods and sampling before ordering. Review inspection records and trial capability for the actual job.
Surface preparation, coating adhesion and lubrication affect forming consistency. Installation chips do not enter the die. Assess scratches, pickup and flaking on returned tooling, alongside the wire and machine records.
Surface preparation, coating adhesion and lubrication affect forming consistency. Installation chips do not enter the die. Assess scratches, pickup and flaking on returned tooling, alongside the wire and machine records.
Agree critical drawing dimensions, tolerances, measurement methods and sampling before ordering. Review inspection records and trial capability for the actual job.
Check formed point dimensions and drilling performance at agreed sampling intervals. A fixed hit count or installation time is not a universal acceptance limit; maintain traceable die, wire and machine records.
Agree critical drawing dimensions, tolerances, measurement methods and sampling before ordering. Review inspection records and trial capability for the actual job.
Choose TiCN, TiAlN or uncoated tooling from the actual wire contact, forming load, lubrication and wear observed in a comparative trial; roofing zinc or installation plate heat does not determine the die coating.
For precision products, send drawings or samples directly; our engineering team evaluates the critical tolerances and the right L series (L1–L7 available as matched pairs). Difficult materials like stainless get an extra review of edge geometry and finish requirements.
Start with one matched trial set in your own QA process, then use accepted-output and inspection data to decide on volume supply.
Agree critical drawing dimensions, tolerances, measurement methods and sampling before ordering. Review inspection records and trial capability for the actual job.
Check formed point dimensions and drilling performance at agreed sampling intervals. A fixed hit count or installation time is not a universal acceptance limit; maintain traceable die, wire and machine records.
Choose TiCN, TiAlN or uncoated tooling from the actual wire contact, forming load, lubrication and wear observed in a comparative trial; roofing zinc or installation plate heat does not determine the die coating.
Match screw size, drill diameter, flute length and style to the current product table and approved drawing. Validate the intended joint with the finished screw. Evaluate HSS/carbide and optional PVD against the actual wire and forming process.
Send the specification for a matched trial set. Validate it in your QA process before committing to volume.